Problems caused by high humidity are:
1. Excessive scuffing and black marking from traffic until finish dries hard.
2. Poor detergent and water resistance due to the delay in finish cross-linking.
3. The threat and reality of gluing furniture to the floor.
4. Streaking and mop drag created by the coat being applied biting into preceding coats. (this phenomenon is caused by the applied coat re-emulsifying the previous coating that has not yet cure.) Another important aspect in the drying of floor finish is the correlation between drying time and solids of the finish. Higher solids results in a thicker film developing on the floor and thus, a greater period of dry time being required between coats (sometimes in excess of one hour).
No comments:
Post a Comment